Production Manager:
Before I had to machine the part in different clampings with the following problems:
- Dents
- Critical thickness accuracies
- Burr problems
Thanks to Flexible Production Method we had the chance to optimize the cycle in order to solve quality and cycle time problems.
In addition, now we can tool from one part to another in 15 minutes thanks to the great availability of ever-present tools in stock. In fact the changeover consists only of clamp change.
Giuliano Pintossi
Production Manger
CAVAGNA GROUP S.p.A. – OMECA Branch
Via Statale 11/13 – 25010 Calcinato, Ponte San Marco (BS)
Italy