KRAMER ITALIA S.r.l.

Production Manager:

 

I had cycle time problems due to downtime in tool changes and loading parts. In order to have all machining processed on the part I had to tool different machines.

Now I load the part on the free pallet, while the units are machining.

The positive results are a considerable reduction of production times, precision and reduction of set up times.

 

 

Eng. Marco Stradiotti

Production Manager

KRAMER ITALIA S.r.l.

Via Matteotti 1 – 13864 Crevacuore (BI)

Italy

www.kramer-italia.it